კავკასუს როუდ პროჯექტი

+99532 2 43 90 96
info@crp.ge
44 Kote Apkhazi str.
Meidan/Palace
Mon. - Fri. 9.00 - 18.00
Saturday - Sunday / Closed

TUNNEL FROM VERE RIVER VALLEY TILL BAKHTRIONI STREET

Caucasus Road Project

03/29/2024
crp
14107
გზის ინფრასტრუქტურა
Location: Tbilisi, Vere River Valley. Short Description: After the construction of the motorway the need for a tunnel running in Ikalto Mountain was arisen. Caucasus Road Project started to work on the project soon after and by the end of July, 2012 the construction works of Tunnel was finished. It created the shortest way between two central districts of Tbilisi. Tunnel is 204 meters in length and 11 meters in width. Carriageway is 8.5 meters wide, allowing the vehicles to move in both directions. The construction of the tunnel and its linking roads started on 1st of June, 2011 and ended on 26 of July, 2012. Subcontractors: ALGA (Italy), JSC “Hidroenergomontage” and “Interproeqt” LLC.